Load assessment
Identify the equipment, operating load and any planned additions before selecting battery capacity.
POWER BACKUP & INFRASTRUCTURE
Match UPS and battery capacity to the time your equipment must stay online.
Discuss this solution
THE SOLUTION
Backup duration depends on both the load and the battery system. Spurlink helps define the runtime target for servers, network equipment and other supported IT loads, then evaluates a suitable Eaton or Vertiv configuration. We distinguish short ride-through requirements from longer continuity needs. The selected model’s runtime data and installation conditions inform the final proposal.
PRODUCT TYPES & CAPABILITIES
Identify the equipment, operating load and any planned additions before selecting battery capacity.
Compatible internal or external battery options are reviewed using the selected UPS model’s runtime information.
The required backup interval is coordinated with generator availability or the time needed for an orderly shutdown.
Battery age, environment, monitoring and replacement access are considered as part of the working-life plan.
OEM PRODUCT SPOTLIGHT
Explore products from our OEM portfolio. We confirm the exact model, configuration and availability for your project.

Eaton
An Eaton 9PX online UPS family example for IT power protection. Capacity, battery configuration and runtime are selected using the actual connected load and site conditions.
Official product informationTYPICAL APPLICATIONS
BEFORE WE SPECIFY
01Actual load and required backup duration
02Compatible batteries and installation environment
03Generator timing or controlled-shutdown requirements
COMPLETE THE SOLUTION
LET’S BUILD WHAT’S NEXT
Tell us what your business needs. We’ll help connect the right technologies to it.